We work well with PG&E to make sure the project runs well from the start of design to the last inspection. Being a Directional Drilling contractor with the necessary training and PG&E OQ certificates, we can complete your project using either a Trenchless method, an Open Trench method, or a hybrid of the two. PG&E can install the tap solely in the tap pit since we are qualified to install the utility from the house to the final location, enabling for speedy backfill of the entire project and avoiding months of waiting due to PG&E's overbooked crews' qualified crews' schedules. Contact us so we can put a plan in place to ensure that your project runs without a hitch.

We hold the Following PG&E Operator Qualifications Certifications

  1. OQ 05-07 Damage Prevention During Excavation

  2. OQ 02-12 Applicant Install Gas Line Open Trench or Bore

  3. OQ 21-11 Mechanical Stab Fitting

  4. OQ 02-15 (NEW) PG&E Requirement 2021

  5. OQ 02-14 Tracer Wire

  6. Locate tracer wire after backfill

  7. OQ 21-14 Lycofit Mech.

    Fitting Connection PE Pipe

All PG&E Installers need each OQ to do specific items.

New Gas & Electrical - Qualification Requirements Effective January 1, 2019 to do PG&E Work.

PG&E OQs Certified Contractor Bay Area

  • PG&E Certified OQs Required for work

  • Pre Construction Meeting

  • USA

  • Traffic Control Signage & Flaggers

  • Traffic Control Drawings all variations

  • 3rd Party Utilities Locating

  • Crossing & Paralleling Utilities Potholing

  • Shoring End Shores

  • OSHA Certified Agent for PG&E requires approved card holder

  • Top hating on all potholing

  • Open Trench as needed per design

  • Pre-Bore CROSSBORE TEAM Drawings

  • Pre-Bore CROSSBORE TEAM Paperwork

  • Bore Productions Bore Out & Pull Back Production

  • Bore Mud Reclaiming

  • Bore Mud Disposal at special facility

  • Post-Bore CROSSBORE TEAM Drawings

  • Post-Bore CROSSBORE TEAM Paperwork

  • PG&E ITS Card Scan Fees Paid for PG&E paperwork

  • Restoration of all pits from bores

  • Restoration per different cities pits and potholing subgrade

  • Restoration per different cities asphalt T cuts and over cuts, grinding asphalt and restoration in various asphalt materials and thickness requirements.

  • Permits documentation & drawings

  • Turnkey options on projects

IMG_7069.JPG
IMG_7070.JPG
IMG_8874.jpg
static1.squarespace.png
image.jpg
IMG_5349.jpg
IMG_5242.jpg
IMG_1807.jpg

PG&E Joint Trench, PG&E Gas Trench, PG&E Electric Trench, CATV, PG&E Gas & Electric Joint Trench.

0d612049-a328-49e0-a69f-80b0d3a6599a.jpg
Underground Utility Contractor Bay Area, PG&E Joint Trench, PG&E Gas Trench Tie In Pit
IMG_2709(1).jpg
IMG_2901(1).jpg

Directional Bore

IMG_1869(1).jpg
IMG_2900.jpg
PG&E Joint Trench Asphalt Restoration Underground Utility Contractor Bay Area, PG&E Joint Trench, PG&E Gas Trench Tie In Pit

PG&E Joint Trench Asphalt Restoration
Underground Utility Contractor Bay Area, PG&E Joint Trench, PG&E Gas Trench Tie In Pit

PG&E Joint Trench Specialist...

We are very experienced at PG&E Gas, Electric, Cable & Phone Individual or PG&E Joint Trench. We handle Encroachment Permit Process, Traffic Control Plan Design & Submittal, Traffic Control setup, Saw Cutting, Asphalt Grinding, Demolition of Asphalt & Concrete and disposal, Steel Plating flush or asphalt edges, Hydrovac Excavation Potholing / Daylighting, Excavation, T- Cutting, Asphalt put back trench restoration we handle the complete package let us manage you next encroachment & onsite excavation and underground utility needs.

 
 
 
Underground Utility Contractor Bay Area, PG&E Joint Trench, PG&E Gas Trench Tie In Pit

Underground Utility Contractor Bay Area, PG&E Joint Trench, PG&E Gas Trench Tie In Pit.

Requirements for Customer Dug PG&E Gas Trenches:
New Construction Operator Qualifications tasks are effective January 1, 2019.
Scope:
Federal and State regulation (CFR 49.192, Subpart N and GO 112F) require that individuals performing
covered tasks on the gas pipeline system or in construction of new gas pipeline facilities that will be
connected to the gas pipeline system hold the applicable qualifications at the time of performing the
work.
Requires OQ Qualified individual to direct and observe the work being performed by a non-Qualified
individual and be able to give direction/take over if necessary.
All individuals performing covered tasks on the gas pipeline system or in construction of new gas
pipeline facilities must be qualified by December 31, 2018.

Pg&e Transformer pad install