Los Altos Hill PG&E Electric Bore

Terrain mapping, waypoint crossing utilities mapping, and bore path planning we take the guess work and refine your complex bores. We use the cutting edge tecknology available to creates continuous topography marked with utilities and waypoints, which previously used expensive survey methods. By doing this we optimize the bore path and provide a mapping service if a client wants a bore path drawing with crossing utilities.

We are technology driven we provide additional services for bore topography and bore path planning.

Making sense of the complex bores

Pebble Beach Directional Drilling Bore

APEX is an experts in directional drilling trenchless
technology for Essential Utility Infrastructure Construction.

IMG_2300.jpg

8” hdpe main bore

RESIDENTIAL DIRECTIONAL BORE

Under driveways, completed landscapes down side yards for all utilities for ADUs, can’t make slope for a gravity sewer for your ADU we install force main sewers in bore with EOne sewer grinder pumps, sump pumps and many other solutions the best thing to do is call us for a consultation over the phone or in person we can help you with any solution you might need and educate you on possibilities. PG&E OQs Gas & Electric Pipe in a Bore OQs Certified.

Gate power, Gate Security Camera, Irrigation, Drainage, Communications, Sewer, Water Main, Irrigation Main, Force Main Sewer, Sump Wells for House & Basement Perimeter & Light Well, Downspout Drainage, PG&E OQs Gas & Electric Joint trench with Data & Telecom, Under Concrete bore for Sewer and water verify common with pits along the way with cleanouts, clean check backflow, we can preform complete simple to complex bores 20ft to over 1600Ft and mole service for anything from a walkway, sidewalk and micro solutions for your mini project needs as a home owner, business owner we are here to help.

Each drilling project is meticulously planned to ensure success by APEX Directional Drilling, a pioneer among Bay Area Silicon Valley horizontal directional drilling businesses. One of the most important steps in our quality control procedure is the pre bore profile and post bore profile.

Our project managers take into account every aspect of your project, including any no-drill zones, geotechnical data, subterranean utilities, and other site restrictions. We develop a thorough pre-bore profile once all the data from the initial drilling has been acquired. Your pre-bore profile is the road map that takes all of your project's practical constraints, environmental issues, and safety considerations into account.

An environmentally friendly technique called horizontal directional drilling (HDD) is used to install pipeline networks underground without causing any damage to obstructions like watercourses, river valleys, swamps, erosive furrows, paved roads or highways, rail tracks, hills, or structures. The installation of common products, oil and gas pipelines, multi-duct casings, and electrical and fiber optic communication lines are its main uses.

20190803_231328747_iOS.jpg

Advantages Of This Method

  • Reduces execution time by increasing productivity and efficiency

  • Independent of climatic conditions

  • Mitigates surface environmental impact

  • Reduces visual impact

  • Protects wildlife and breeding stock

  • Assists passage of fish and protects aquatic plants

  • Decreases water clouding

  • Reduces remediation costs

  • Bypasses underground networks and obstacles

  • Ensures continuity of land and river traffic

  • Protects plant life cover

  • Attenuates adverse effects of construction process

  • Minimizes slope and coastline disturbance

  • Optimizes hygiene and safety at work

  • Reduces operational costs

  • Guarantees long term integrity of installed network

  • Cost effective alternative

  • Installs underground urban networks without the need of open cut trenches

IMG_2746.jpg
Residential Home Owner needed 3” Driveway Sleeve Boring for new Electric Gates in Pouring Rain..

Residential Home Owner needed 3” Driveway Sleeve Boring for new Electric Gates in Pouring Rain..

3” Pipe sitting in vineyards waiting to be pulled into under driveway.

3” Pipe sitting in vineyards waiting to be pulled into under driveway.

IMG_2753.jpg

3” Driveway Sleeve in Vineyards being pulled in 40” under driveway for Electric Security Driveway Gates Conduit.

3” Sleeve for Gate conduit pulled into place, another completed Bore for a happy Home Owner.

3” Sleeve for Gate conduit pulled into place, another completed Bore for a happy Home Owner.

IMG_0143.jpg
IMG_0046.jpg

Taking the time to construct a proper and detailed pre-bore profile may save you time, energy, and money later on. Your well-planned bore profile is an important step in the success of your horizontal directional drilling project.

The post-bore profile: as-built drawings that hit the mark

Upon completion of the drilling, our technical design team provides you with a rod-by-rod chart of the bore profile for the city public work dept., PG&E and others who require records.

We track all discrepancies or changes to the project in our final drawings. As part of our QC process, we then send these finalized drawings back to our clients. The similarity between our pre-bore profile and our final as-built profile is an indicator of our expertise.

IMG_0308.jpg
IMG_0321.jpg

Apex has a fully integrated
GNSS receiver that provides positioning information directly to
the walk over walkover locating system. iGPS is
purpose-built for HDD field applications where above-ground
location data must be seamlessly integrated with underground
locating data.

Capturing an accurate representation of the bore location is a
requirement for public utilities and private companies installing
underground assets. The iGPS module powers up immediately
upon attachment to the Falcon F5 receiver and adds GNSS data
to every logged depth reading. The data is viewable in table
format and can be exported as a KML file for overlay in Google
Earth.

Contact Core Engineering today to setup a site walk.

DJI_0137.JPG
IMG_20190824_132554.jpg
IMG_0260.jpg
IMG_0141.jpg
IMG_6437.jpg
IMG_3095.jpg
IMG_2991.jpg
IMG_3125.jpg
IMG_3046.jpg
IMG_4518.jpg
IMG_3990.jpg
IMG_5365.jpg
IMG_4035.jpg
IMG_5457.jpg
IMG_1196.jpg
IMG_0424.jpg
IMG_6491.jpg
IMG_0215.jpg
IMG_0103.jpg
IMG_0106.jpg
IMG_6455.jpg
IMG_6478.jpg
IMG_9193.JPG
IMG_6439.jpg
IMG_1649(1).jpg
IMG_6499.jpg
IMG_6441.jpg
Directional Boring Contractor Residential, Directional Boring Contractor commercial, Directional Boring Contractor industrial
IMG_6444.jpg
1apex.jpg
2apex.jpg
 
 
 
 

We use tech to our advantage to increase productivity for your projects.

High end residential utility directional boring pg&e Oq certified for boring services.